Construction Logistics That Understands Your Jobsite
When a crane is booked and a crew is waiting, a late delivery doesn't just delay one task—it cascades through your entire schedule. We've hauled enough steel, pipe, and materials to know that construction trucking isn't just about moving freight. It's about coordinating with your project timeline.
We deliver direct to your jobsite, not to a terminal across town. That means your materials arrive where you need them, when you need them—ready for your crew to unload and get to work. Whether it's a 6 AM delivery before traffic hits or a scheduled drop coordinated with your pour date, we plan around your project, not ours.
From single-load hotshot deliveries to full flatbed shipments of structural steel, we handle construction freight for general contractors, steel erectors, concrete contractors, and specialty trades across the country.
Construction Material Delivery
Structural Steel
Beams, joists, girders, columns
Rebar
Bundles, cut lengths, mats
Pipe
Steel, PVC, ductile iron
Precast Concrete
Barriers, panels, vaults, manholes
Sheet Piling
Steel sheets, H-piles
Brick & Masonry
Palletized brick, block, stone
Fencing & Posts
Chain link, panels, posts
Septic Tanks
Concrete, plastic, steel
Why On-Time Delivery Matters
A missed delivery window doesn't just cost you freight fees—it costs you:
- •Crew standing idle at $50-150/hour per worker
- •Crane rentals burning dayrate while waiting for steel
- •Concrete trucks timing out before rebar arrives
- •Schedule delays that push back every trade behind you
We coordinate delivery windows with your site superintendent, confirm access points before dispatch, and communicate proactively if anything changes. No surprises. No excuses. Just materials on site when you need them.
How We Ship Construction Freight
Flatbed Trucking
Full loads of steel, pipe, and heavy materials. 48' and 53' options available.
Learn MoreHotshot Delivery
Smaller, urgent loads. Get materials to the jobsite fast when the schedule can't wait.
Learn MoreWhy Project Managers and Contractors Work With Raise Logistics
- •Direct jobsite delivery — not terminal to terminal
- •Delivery windows coordinated with your schedule
- •One point of contact from quote to delivery
- •Experience with site access challenges (tight lots, unpaved roads, flaggers)
- •Partial load options when you don't need a full truck
- •Tracking links on demand
Get Your Construction Freight Moving
Ready for a quote? Fill out our form or use our rate estimator for an instant estimate on your next load.